LEIPZIGER Logistik
&Lagerhaus Hamburg GmbH


Pinkertweg 10-12
22113 Hamburg
Tel.: 0049 40 / 55 89 613 - 20
Fax: 0049 40 / 55 89 613 - 40

 

Meet us on 24.-27.09.2015 at NUFAM in Karlsruhe.

You find us in dm-arena at stand  E 02.

 

We are looking forward to meeting you!


NUFAM 2015

 

History

With our company we do look at a successful company history of more than 20 years and since than we have developed to a strong specialised contract logistics service provider.

The main key to our success is the consequent expansion of our infrastructure with extensive nation-wide warehouse capacities. Some examples are the construction of large food halls as well as the set-up of a modern fettling shop, a steel blasting and a priming coat facility for iron casting. Therefore we dispose over comprehensive capacities in the field of food and cast iron. Supplementary we have developed to a Full-Range supplier of the trade distribution and guarantee a high depth of services within this area of competence. With the consequential extension of our core businesses we are a reliable partner for a continuously growing number of logistics, contract and outsourcing requirements.

1990 

Foundation in Leipzig after the Reunification

1991

Rental of a warehouse facility in Leipzig and usage as the company premises’

1992

Opening of a city office in Baden-Baden

1993

Construction of the Leipziger headquarters and purchase of a 3,5 ha wide site

1994

Opening of a branch in Karlsruhe - Westbahnhof

1996

Construction of another warehouse hall with a total area of 15,000 square meters

1997

The headquarters’ infrastructure is completely developed and implemented

1998

Extension of the truck fleet / Restructuring to combination transports

1999

Purchasing of Heat Exchange Bridges

2000

Move from Baden-Baden to Bischweier, close to Rastatt; Switch over to the latest IT-Technique

2001

Move from Karlsruhe to Ettlingen: Increase of the total warehouse capacity to 6,500 square meters combined with a secured open area of 1ha size; Installation of a Transshipment-Point; Member of the ILN-Network. Installation of a new communication infrastructure in Ettlingen

2002

Installation of a field warehouse in Ettlingen with a total warehouse area of 5,000 square meters

2003

Construction of another priming coat facility

2004

Extension of the fettling shop to 1,000 square meters

2005

Rental of an additional hall complex in Leipzig with a total warehouse area of 5,000 square meters

2006

Construction of a steel blasting facility for iron casting with a diameter of 1,80 m and load capability of 2 tons

2007

Construction of a fettling shop and consequentially the creation of 24 additional workplaces;

Application of a dust extraction plant with a handling performance of 100,000 cubic meters per hour;

Extension and renewal of the long-distance fleet to 50 trucks and conversion to EURO-5 Norm

2008

New construction of a hall with an area of 2,000 square meters used for the storage of soft drinks and extension of the Leipzig site’ to 7,5 ha

2009

Extension of the hall complex by another 2,000 square meters used for the Display set-up and commissioning; Opening of the regional warehouse in Regenburg and Langenselbold

2010

Greening of all grounds and plantation of 110 cherry trees; Construction of another ramp; Installation of a pallet repair (certified in accordance to EPAL); Extension of the company-owned long-distance fleet to 70 trucks; Set-Up of a customer service in English, Spanish, Italian and French; Installation of a new IT-System

2010

Scheduled: Opening of a branch in Frankfurt am Main; Extension of the company-owned fleet to 95 trucks; Intensification of the intermodal transports; Sales of food from Latin America with the appropriate logistics infrastructure

2011

Foundation of a further company in Hamburg; extension of truck fleet by 30 heavy trucks. Opening of a warehouse in Hamburg with 4,000 sqm and further expandability.

2012

Establishment of new business area Leipziger Werft

2013

Establishment of business area Art Consulting
Construction of a sorting and pallet plant with an annual capacity of 2.5 million DD pallets in Ettlingen.
New external storage area in Ettlingen with 8,500 sqm for the storage of sweet beverages
Storage of boats and mobile homes in Leipzig and first attempts to walk by Leipziger Werft
Transportation deal with Punica Hamburg by LLL Hamburg
Large-scale test with gas-operated trucks and Euro 6 engines

2014

Foundation of LEIPZIGER Galerie

2015

Start of boat rental of LEIPZIGER Werft

2015

First fair participation of LEIPZIGER at Transport Logistic in München